Submit documents for exemption from planning permission for a change of use of a facility

  • Service description

    Before you are permitted to alter the use of a project that is exempt from planning permission, you will need to apply for an exemption. This means that you do not need planning permission, but you must submit verifiable documentation to the relevant authority (for example, for a detached house in a local development plan area).

    In the event of a change of use, do not carry out any structural alterations (for example, converting a residential building into office space).

  • Procedure

    You can submit an exemption from authorisation for the change of use of a facility electronically via the online service or in paper form using the form.

    To use the form, proceed as follows:

    • Please fill in the form.
    • Add the required building documents.
    • Please submit the documents to the relevant department.
    • If documents are missing or there are other ambiguities, you will be asked to complete or rectify them.
    • In this case, submit the missing or amended documents and/or the clarification.
    • The relevant local building control authority will examine your application.
    • You may start building if:
      • if you do not receive a reply from the local building control authority within one month
      • or has previously stated in writing that no authorisation procedure is to be carried out and that it will not apply for a prohibition. are to be dealt with.
    • If the relevant authority decides that a simplified planning permission procedure should be carried out, your documents will be returned to you.
    • When submitting the documents, you can specify that your building documents should in this case be forwarded to the responsible building supervisory authority and treated as a building application.
    • You may receive a notification of charges.
    • Pay in the fees.
  • Who should I contact?

    the lower-level building control authority of the district or the independent city

  • Prerequisites

    • Building project complies with public law regulations

    You do not need authorisation for your building project if

    • it is located in a development area whose development plan has been approved,
    • it does not contradict the provisions of the development plan,
    • the development is secured and
    • the lower-level building control authority does not request a simplified planning permission procedure or apply for a provisional prohibition within the statutory time limit.

    If you want exceptions and exemptions from the provisions of the development plan, you must apply for these separately before submitting the licence exemption.
     

  • Which documents are required?

    • Form for authorisation exemption procedure (digital or written)
    • Extract from the official property register
    • Site plan
    • Construction drawings
    • Building description
    • Calculation of the permitted, existing and planned extent of building utilisation
       
  • What fees are incurred?

    Fees are charged according to the statutes of the respective municipality.

  • What deadlines do I have to observe?

    There are no deadlines.

  • Processing time

    Exception: The local authority informs you within the one-month period that the simplified planning permission procedure is to be carried out or declares that a provisional prohibition has been applied for.

    Deadline: 1 month

  • Legal basis

  • What else should I know?

    If you have a licence exemption, you must submit a notice of commencement of construction work to the lower building supervisory authority at least one week before the start of construction work.

  • Author

    Ministry of Infrastructure and Digital Affairs of Saxony-Anhalt

    Forwarding service: Deep link to the original portal
  • Applications / Forms

Help with accessibility

  • General

    We strive to make our websites accessible to all users. Details can be found in our accessibility statement. You can send us your suggestions for improvement using our accessibility feedback form.

  • Font size

    To adjust the font size, please use the following key combinations:

    Larger

    command
    +

    Smaller

    command

    Larger

    Ctrl
    +

    Smaller

    Ctrl
  • Keyboard navigation

    Use TAB and SHIFT + TAB to navigate through next/previous links, form elements, and buttons.

    Use ENTER to open links and interact with elements.

  • Contrast mode

    Press the following key combination to reduce or increase the contrast:

    Enlarge

    control
    option
    command
    .

    Decrease

    control
    option
    command
    ,
    Note: The shortcuts must be activated in the system settings of the operating system.

    Press the left ALT key + left SHIFT key + PRINT to quickly turn high contrast mode on or off.

  • Invert colours

    Press the following key combination to switch the colour inversion on and off:

    control
    option
    command
    8
    Note: The shortcuts must be activated in the system settings of the operating system.

    First activate the screen magnifier and then switch the colour inversion on and off with the following key combinations:

    1. screen magnifier

    +

    2. invert colours

    Ctrl
    Old
    I
  • Screen magnifier

    Press the following key combinations to use the screen magnifier:

    Switch on/off

    option
    command
    8

    Enlarge view

    option
    command
    =

    Zoom out view

    option
    command
    Note: The shortcuts must be activated in the system settings of the operating system.

    Switch on / Enlarge view

    +

    Zoom out view